The City of Hamilton has a contract with Rankin Construction Inc. to complete works as called for under contract C15=40-15 (BR). Works are tentatively scheduled to commence on or about Monday June 29, 2015. All works should be substantially completed by October 2015; weather permitting.

The scope of work includes: complete removal of existing structure, and construction of new semi-integral abutment type bridge, localized road resurfacing and associated restoration.

In order to safely complete this work, a full road closure (local access only) will be required between Golf Club Road and Guyatt Road. Detours will be posted for through traffic. During this time you may experience some inconveniences such as noise, dust, and restricted traffic movement. As required, proper flagging / signage will be established to control traffic. Every effort will be made to do the work in a timely manner and to keep any inconvenience to a minimum. We ask for your patience during this period.

For the duration of the project, the City of Hamilton’s on-site inspector will be made available to explain the sequence of work and make note of any anticipated problems during construction. If you have a medical condition or any physical conditions that may require special attention, please advise the Construction Section as soon as possible.

This notice is your connection to the Construction Section. Please keep it in a convenient location for future reference. We ask for your co-operation during this period and request that any questions regarding this work be directed to either:

o The City’s on-site inspector, Abdul Ali (SNC-Lavalin)

,, Michael Asante-Nimako (SNC-Lavalin), Project Administrator

• Tim Evans, Project Manager (905) 546-2424, ext. 4396

,, the City Of Hamilton Construction Section (905) 546-4313