Over the summer you will see the following upgrades:

  • Given problems with well water a new well will be drilled and the old well will be capped.
  • There will be a new heating and air unit placed on the roof.
  • The front area will be getting assessable doors installed. 
  • There will be a new Concession area and counters.
  • A water filling station will be installed in the lobby for personal water bottle use.
  • A handicap washroom will be installed. 
  • The men’s and woman’s washrooms will both see new fixtures and upgrades.
  • There will be new paint in the front entranceway and lobby area.
Read More